Handover cleans across a build program
A repeatable handover-clean checklist and process for site supervisors booking builders cleans across a program of houses, from scope through sign-off.
Most advice about booking a builders clean assumes a single house and a single decision. A site supervisor running a project home build program books the same kind of clean every few weeks, for a different address each time, often with two or three other lots at a different stage.
The practical difference is what a gap costs. A missed detail on one job is a lesson for that job alone. The same gap on a program repeats on the next lot until it moves out of a phone call and into a document the whole team uses.
What the scope of works should pin down
A verbal agreement survives one job. Across a program it produces a different account of what was promised on every job, because a different person remembers the call each time. Put the arrangement in writing once and reuse it lot to lot.
- What is included in the quoted price and what is billed separately, defined the same way on every lot.
- A standard exclusion list: rubbish removal, external glass above single storey, anything the cleaner will only quote after seeing the site.
- How a defect gets recorded, using the same format every time: a photo, the room name and a date.
- Site access, induction and any PPE requirement the cleaning crew has to meet, since these vary from lot to lot on an active build.
- The re-clean clause: how many are included, what triggers one, and what a return visit costs when another trade caused the mess.
How to choose a builders clean contractor covers agreeing this before the first job; carry the same clause into every contract that follows.
Coordinating the calendar across several lots
A handover date set months out in a sales contract and a site that is actually ready are two different things. The clean has to follow specific trades finishing, and running a program means tracking that for several houses at once.
- Confirm the lead time your cleaner needs to hold a slot, and check that figure again for a month when several lots finish close together.
- Keep a second cleaner or crew on file for weeks carrying more than one handover, so a capacity crunch does not land on whichever house was booked last.
- Name who has the authority to call a site not ready and push its clean back a day, so the call does not default to whoever is on site when the cleaner arrives.
- Leave a buffer between the final clean and the client walkthrough, long enough to absorb one trade running a day late.
The supervisor's own walkthrough
Run your own walkthrough before the client's, using Pre-handover inspection checklist for the room-by-room standard: glass, wet areas, cabinetry, floors. On a program this is a scheduled step on every lot.
- Time it after the final clean and before the client walkthrough, with enough gap to send the crew back if something fails.
- Confirm one named role does the walkthrough every time, so the standard stays the same from lot to lot.
- Carry the checklist and a camera on every visit, including the lots you are not worried about.
Managing one contractor across the whole program
Vetting a contractor for a single job and vetting one for a whole program call for different depth. How to choose a builders clean contractor and What is BSCAA, and why does it matter cover the checks worth making before the first job. On a program, make those checks once at onboarding and apply the result to every lot that follows.
- Set one onboarding check covering insurance, WHS induction and BSCAA status, done once at the start of the program.
- Keep one point of contact on the cleaner's side for the whole program, so the same person answers for every lot.
- Treat a defect or a missed date that recurs across more than one lot as a contractor decision: raise it in the next contract, not just at the next walkthrough.
Get quotes
Tell us about the site and the stage. We pass your details to a cleaner servicing your area.